Kepsut, Balıkesir

Poyraz WPP

Poyraz Enerji

Constructed by Poyraz Yenilenebilir Enerji Üretim A.Ş.., one of our subsidiary companies.

2012
Balıkesir, Kepsut

It is located in Balıkesir, Kepsut and started commercial operation in 2012.

85,5 MWm – 75,3 MWe Installed Power

Generates electricity with an installed capacity of 66.9 MW.

34 Wind Turbines

The wind farm consists of 33 turbines with a capacity of 2 MW and 1 turbine with a capacity of 0.9 MW.

Electricity Consumption of 61,000 People

Supplies electricity demand of 61,000 people.

125,000 Tons CO₂e Emission Reduction

Approximately 125,000 tons of CO₂e emission is offset annually.