BESS supply agreement with Rolls Royce.
127 million Euro 22-year loan with BayernLB and TSKB.
Geycek RES 46.6 MW Hybrid GES completed.
Geycek became Turkey's first multi-source hybrid plant.
PE Europe established, transitioning to a multinational structure.
8.4 MW capacity increase completed, reaching 118.4 MW installed capacity.
Göktepe RES commissioned. Seyitali RES reached 40.7 MW.
Structured as 50% Polat Holding, 50% Maxis Venture Capital and Clean Energy GSYF.
48 MW capacity increase completed, reaching 288.1 MW.
Cıngıllı GES started production.
Poyraz RES 66.9 MW, Seyitali RES 36 MW installed capacity.
100 MW capacity increase completed, reaching 240.1 MW.
Partnership with PSP Investments established.
Geycek RES commissioned.
Poyraz RES started production.
Seyitali RES commissioned.
Our first wind farm Soma RES started production.
Polat Energy was established to operate in renewable energy.
Partnership agreement signed with EDF Renewables.