History

The Power of Nature, The Energy of the Future.

The Power of Nature, The Energy of the Future.

Polat Energy: From The Past to The Present

2025

  • BESS supply agreement with Rolls Royce.

  • 127 million Euro 22-year loan with BayernLB and TSKB.

  • Geycek RES 46.6 MW Hybrid GES completed.

  • Geycek became Turkey's first multi-source hybrid plant.

2024

PE Europe

PE Europe established, transitioning to a multinational structure.

2023

Göktepe RES

8.4 MW capacity increase completed, reaching 118.4 MW installed capacity.

2022

New investments

Göktepe RES commissioned. Seyitali RES reached 40.7 MW.

2021

Shareholding structure

Structured as 50% Polat Holding, 50% Maxis Venture Capital and Clean Energy GSYF.

2020

Soma RES

48 MW capacity increase completed, reaching 288.1 MW.

2019

Cıngıllı GES

Cıngıllı GES started production.

2016

Capacity increases

Poyraz RES 66.9 MW, Seyitali RES 36 MW installed capacity.

2015

Soma RES

100 MW capacity increase completed, reaching 240.1 MW.

2014

Partnership

Partnership with PSP Investments established.

2013

Geycek RES

Geycek RES commissioned.

2012

Poyraz RES

Poyraz RES started production.

2011

Seyitali RES

Seyitali RES commissioned.

2009

Soma RES

Our first wind farm Soma RES started production.

2008

Foundation

Polat Energy was established to operate in renewable energy.

2000

Partnership

Partnership agreement signed with EDF Renewables.